News Echo

  • +23481-2435-0783
  • news@newsecho.com.ng
Search
Close
  • Home
  • News
  • Crime
  • Sports
  • City Reports
  • Business
  • Politics
  • e-Edition 2023
Menu
  • Home
  • News
  • Crime
  • Sports
  • City Reports
  • Business
  • Politics
  • e-Edition 2023
NewsInsider
  • Home
  • News
  • Crime
  • Sports
  • City Reports
  • Business
  • Politics
  • e-Edition 2023
Menu
  • Home
  • News
  • Crime
  • Sports
  • City Reports
  • Business
  • Politics
  • e-Edition 2023
NewsInsider
Home News

Nationwide blackout: Labour Union shutdown national grid – TCN

Uchenna Ezeadigwe Awka by Uchenna Ezeadigwe Awka
June 3, 2024
in News
Reading Time: 2 mins read
0
Nationwide blackout: Labour Union shutdown national grid – TCN
0
SHARES
26
VIEWS
Share on FacebookShare on Twitter

 

The Transmission Company of Nigeria hereby informs the general public that the Labour Union has shut down the national grid, resulting in black out nationwide. The national grid shut down occured at about 2.19am this morning, 3rd June 2024.

Confirming the report, In a press statement signed by GM, Public Affairs, Ndidi Mbah and made available to News Echo through the EEDC PRO, Mr Chukwuemeka Eze on 3rd June, 2024 said “At about 1:15am this morning, the Benin Transmission Operator under the Independent System Operations unit of TCN reported that all operators were driven away from the control room and that staff that resisted were beaten while some were wounded in the course of forcing them out of the control room and without any form of control or supervision, the Benin Area Control Center was brought to zero”.

“Other transmission substations that were shut down, by the Labour Union include the Ganmo, Benin, Ayede, Olorunsogo, Akangba and Osogbo Transmission Substations. Some transmission lines were equally opened due to the ongoing activities of the labour union”.

“On the power generating side, power generating units from different generating stations were forced to shut down some units of their generating plants, the Jebba Generating Station was forced to shut down one of its generating units while three others in the same substation subsequently shut down on very high frequency. The sudden forced load cuts led to high frequency and system instability, which eventually shut down the national grid at 2:19am”.

“At about 3.23am, however, TCN commenced grid recovery, using the Shiroro Substation to attempt to feed the transmission lines supplying bulk electricity to the Katampe Transmission Substation. The situation is such that the Labour Union is still obstructing grid recovery nationwide”.

“We will continue to make effort to recover and stabilize the grid to enable the restoration of normal bulk transmission of electricity to distribute load centres nationwide”.

Uchenna Ezeadigwe Awka

Uchenna Ezeadigwe Awka

default-logo

We’re Impartial And Independent, And Every Day We Create Distinctive, World-Class News Content Which Inform, Educate And Entertain Millions Of People In Nigeria And Around The World.We Care About Quality Content. We Never Wanted To Be A Big Publishing House: Our Team Is Small, But It’s A Truly Wonderful Team Of People Who Really Care About What They Do. Passionate And Dedicated. Honest And Respectful. Professional But Informal.

Facebook Twitter Instagram
Menu
  • Home
  • News
  • Crime
  • Sports
  • City Reports
  • Business
  • Politics
  • e-Edition 2023

Related Posts

Vegastars Casino – Quick‑Play Slots and Instant Rewards

June 18, 2026

Neo Spin Casino: Quick‑Hit Slots and Rapid Rewards for the Fast‑Paced Player

June 18, 2026

Roopokies Casino: Quick‑Hit Slots and Rapid Roulette for the Fast‑Paced Player

June 18, 2026
newinsider frontpage
NEWSINSIDER MAGAZINE

Copyright @2023 – NewsEcho All Right Reserved.

  • About
  • Advertise
  • Privacy & Policy
  • Contact